Utilization of Work Breakdown Structure (WBS) and Building Information Modeling (BIM) for Dam Maintenance in Indonesia: A Literature Study
Corresponding Author(s) : Toha Saleh
OPSearch: American Journal of Open Research,
Vol. 4 No. 1 (2025): OPSearch American Journal of Open Research
Abstract
The rapid construction of dams in Indonesia necessitates a more reliable and efficient maintenance process to prevent potential failures, which could result in substantial economic and social losses. This study highlights the importance of early damage detection through enhanced dam operation, maintenance, and monitoring, supported by detailed references for maintenance activities. By integrating the Work Breakdown Structure (WBS) with Building Information Modeling (BIM) technology, the research evaluates the current maintenance system and provides a structured approach for improvement. The proposed WBS, validated through BIM, facilitates a comprehensive and systematic maintenance framework. This integration demonstrates potential for cost efficiency, improved dam maintenance performance, and informed policy and decision-making processes in Indonesia.